Ordinance No. 2008-01
Establishing Water Connection Fees
Effective April 7, 2008
Meter Size (inches)Connection Fee
5/8 x 3/4$1,185.00
3/4$1,220.00
1Actual Cost
1-1/2Actual Cost
2Actual Cost
3Actual Cost
4Actual Cost
6Actual Cost

__________________________________________
Ordinance No. 2005 - 03
Establishing Water Facilities Fees
Effective June 6, 2005
1. Residential Facilities Fee – Water facilities fees shall be calculated and charted according to an amount per square foot of living space for the area to be constructed. The facilities fees shall be $1.64 times the square feet of living space as determined by the Building Permit.
2. Commercial Facilities Fee – Water facilities fees shall be charged according to the following schedule:
Meter Size (inches)EDUFacilites Fee
5/8 x 3/41$3,358
3/41.55,037
12.58,395
1-1/2516,790
2826,864
31550,370
42583,950
650167,900



____________________________________________
Ordinance No. 2008-02
ELECTRIC CONNECTION CHARGES-
EFFECTIVE April 7, 2008
A. Single phase, 120/240 service – 200 amp Three-wire overhead
1.Temporary: Actual Cost
2.Permanent connection to structure: $1,248.Temporary connection to customer-owned power pole and subsequent transfer to structure: $1,534

B. Single phase, 120/240 service – 200 amp Three-wire underground (overhead transformer)
1.Permanent connection to structure: $1,248
2.Temporary connection to customer-owned power pole; removal of same and installation of underground permanent service to structure: $1,534

C. Single phase, 120/240 service – 200 amp Three-wire underground (padmount transformer)
1)Permanent connection to structure: $1,248
2)Temporary connection to customer-owned power pole; removal of same and installation of underground permanent service to structure: $1,534

D. Single phase, 120/240 service – 400 amp Three-wire underground or overhead
1)Permanent connection to structure: $2,364
2)Temporary connection to customer-owned power pole; removal of same and installation of underground permanent service to structure: $2,649

E. Three phase, 208v, 240v or 480v service Four-wire overhead
1)Permanent connection to structure: Actual Cost
2)Temporary single phase 120/240 service for construction purposes to become three-phase permanent service to structure: Actual Cost

______________________________________________
Ordinance No. 2008 - 03
Establishing Electric Facilities Fees- Effective April 7, 2008
New Residential Areas: a. 200Amp or less - $1,298.
b. 400Amp - $2,595.
Existing Residential Areas: Within existing residential areas, the developer or owner who builds an improvement on a vacant parcel will pay the difference in facility fees between the current facility fee and the fee that was paid for that particular parcel at the time the residential area was originally developed. In addition, if the developer or owner who builds an improvement on a vacant parcel desires to install a electric service larger than a 200 amp single phase panel, the developer or owner will pay the difference in facility fees between the larger panel and a 200 amp panel.
Modification to Existing Residential Service: A customer desiring to modify the size of an existing panel for a residential service will pay the difference in facility fees, at the current fee schedule, between the larger panel and the facility fee that was paid at the time the existing panel was installed.


Commercial Facilities Fees

Voltage PanelPhase 1 FeePhase 3 Fee
120/240 200A or less$1,298$2,247
120/240 4002,5964,496
120/240 6003,8936,743
120/240 8005,1918,992
120/240 10006,48911,239
120/240 12007,78713,488
120/240 14009,09515,734
120/240 160010,38217,983


Voltage PanelPhase 1 FeePhase 3 Fee
120/208 200A or less$1,125$1,948
120/208 4002,2503,896
120/208 6003,3745,844
120/208 8004,4997,792
120/208 10005,6249,741
120/208 12006,74911,688
120/208 14007,87313,636
120/208 16008,99815,586
120/208 200011,24819,481


Voltage PanelPhase 1 FeePhase 3 Fee
277/480 200A or less$2,596$4,496
277/480 4005,1918,992
277/480 6007,78713,488
277/480 80010,38217,983
277/480 100012,97822,479
277/480 120015,57426,975
277/480 140018,16931,470
277/480 160020,76535,966
277/480 200025,95644,956


Modification to Existing Commercial Service: The customer will pay the difference in facility fees, at the current fee schedule, between the proposed panel and the facility fee that was paid at the time the existing panel was installed. For panel sizes not listed in the previous sections, the facility fee will be calculated by interpolating between or extrapolating from the listed values as appropriate.