____________________________________________ Ordinance No. 2008-01 Establishing Water Connection Fees Effective April 7, 2008
| Meter Size (inches) | Connection Fee | | 5/8 x 3/4 | $1,185.00 | | 3/4 | $1,220.00 | | 1 | Actual Cost | | 1-1/2 | Actual Cost | | 2 | Actual Cost | | 3 | Actual Cost | | 4 | Actual Cost | | 6 | Actual Cost |
__________________________________________ Ordinance No. 2005 - 03 Establishing Water Facilities Fees Effective June 6, 2005 1. Residential Facilities Fee – Water facilities fees shall be calculated and charted according to an amount per square foot of living space for the area to be constructed. The facilities fees shall be $1.64 times the square feet of living space as determined by the Building Permit. 2. Commercial Facilities Fee – Water facilities fees shall be charged according to the following schedule:
| Meter Size (inches) | EDU | Facilites Fee | | 5/8 x 3/4 | 1 | $3,358 | | 3/4 | 1.5 | 5,037 | | 1 | 2.5 | 8,395 | | 1-1/2 | 5 | 16,790 | | 2 | 8 | 26,864 | | 3 | 15 | 50,370 | | 4 | 25 | 83,950 | | 6 | 50 | 167,900 |
____________________________________________ Ordinance No. 2008-02 ELECTRIC CONNECTION CHARGES- EFFECTIVE April 7, 2008 A. Single phase, 120/240 service – 200 amp Three-wire overhead 1.Temporary: Actual Cost 2.Permanent connection to structure: $1,248.Temporary connection to customer-owned power pole and subsequent transfer to structure: $1,534
B. Single phase, 120/240 service – 200 amp Three-wire underground (overhead transformer) 1.Permanent connection to structure: $1,248 2.Temporary connection to customer-owned power pole; removal of same and installation of underground permanent service to structure: $1,534
C. Single phase, 120/240 service – 200 amp Three-wire underground (padmount transformer) 1)Permanent connection to structure: $1,248 2)Temporary connection to customer-owned power pole; removal of same and installation of underground permanent service to structure: $1,534
D. Single phase, 120/240 service – 400 amp Three-wire underground or overhead 1)Permanent connection to structure: $2,364 2)Temporary connection to customer-owned power pole; removal of same and installation of underground permanent service to structure: $2,649
E. Three phase, 208v, 240v or 480v service Four-wire overhead 1)Permanent connection to structure: Actual Cost 2)Temporary single phase 120/240 service for construction purposes to become three-phase permanent service to structure: Actual Cost
______________________________________________ Ordinance No. 2008 - 03 Establishing Electric Facilities Fees- Effective April 7, 2008 New Residential Areas: a. 200Amp or less - $1,298. b. 400Amp - $2,595. Existing Residential Areas: Within existing residential areas, the developer or owner who builds an improvement on a vacant parcel will pay the difference in facility fees between the current facility fee and the fee that was paid for that particular parcel at the time the residential area was originally developed. In addition, if the developer or owner who builds an improvement on a vacant parcel desires to install a electric service larger than a 200 amp single phase panel, the developer or owner will pay the difference in facility fees between the larger panel and a 200 amp panel. Modification to Existing Residential Service: A customer desiring to modify the size of an existing panel for a residential service will pay the difference in facility fees, at the current fee schedule, between the larger panel and the facility fee that was paid at the time the existing panel was installed.
Commercial Facilities Fees
| Voltage Panel | Phase 1 Fee | Phase 3 Fee | | 120/240 200A or less | $1,298 | $2,247 | | 120/240 400 | 2,596 | 4,496 | | 120/240 600 | 3,893 | 6,743 | | 120/240 800 | 5,191 | 8,992 | | 120/240 1000 | 6,489 | 11,239 | | 120/240 1200 | 7,787 | 13,488 | | 120/240 1400 | 9,095 | 15,734 | | 120/240 1600 | 10,382 | 17,983 |
| Voltage Panel | Phase 1 Fee | Phase 3 Fee | | 120/208 200A or less | $1,125 | $1,948 | | 120/208 400 | 2,250 | 3,896 | | 120/208 600 | 3,374 | 5,844 | | 120/208 800 | 4,499 | 7,792 | | 120/208 1000 | 5,624 | 9,741 | | 120/208 1200 | 6,749 | 11,688 | | 120/208 1400 | 7,873 | 13,636 | | 120/208 1600 | 8,998 | 15,586 | | 120/208 2000 | 11,248 | 19,481 |
| Voltage Panel | Phase 1 Fee | Phase 3 Fee | | 277/480 200A or less | $2,596 | $4,496 | | 277/480 400 | 5,191 | 8,992 | | 277/480 600 | 7,787 | 13,488 | | 277/480 800 | 10,382 | 17,983 | | 277/480 1000 | 12,978 | 22,479 | | 277/480 1200 | 15,574 | 26,975 | | 277/480 1400 | 18,169 | 31,470 | | 277/480 1600 | 20,765 | 35,966 | | 277/480 2000 | 25,956 | 44,956 |
Modification to Existing Commercial Service: The customer will pay the difference in facility fees, at the current fee schedule, between the proposed panel and the facility fee that was paid at the time the existing panel was installed. For panel sizes not listed in the previous sections, the facility fee will be calculated by interpolating between or extrapolating from the listed values as appropriate.
|